Pioneer Oil & Gas  2 x 800 CMD STP, MBBR

The Challenge

Pioneer Oil & Gas required a reliable wastewater treatment solution to manage the demanding conditions of its operations in Abu Dhabi, UAE. The facility needed to treat large volumes of wastewater consistently, meeting strict regulatory discharge standards while minimizing downtime. Given the operational intensity of the oil and gas sector, the system had to be resilient, efficient, and capable of adapting to variable hydraulic and organic loads.

Client

Pioneer Oil & Gas

Industry

Oil & Gas

EPC Contractor

Gulf Water Treatment CO. LTD

Location

Abu Dhabi, U.A.E

GWT Solution

Gulf Water Treatment (GWT) designed, supplied, and commissioned a state-of-the-art wastewater treatment plant built on Moving Bed Biofilm Reactor (MBBR) technology, with a treatment capacity of 2 × 1000 m³/day. The system was developed as a turnkey package, covering every stage from engineering to live operation. Commissioning was achieved within the agreed timeframe, allowing Pioneer Oil & Gas to initiate safe wastewater processing without operational disruption.

A key focus of the solution was sustainability and reliability. GWT optimized the treatment process to minimize sludge generation and reduce chemical use, lowering the environmental footprint while cutting down recurring costs. The plant was built with design resilience in mind, capable of handling variable hydraulic and organic loads that are typical in oil and gas facilities.

To safeguard long-term performance, GWT established a tailored Operation & Maintenance program, which includes preventive maintenance, on-demand technical support, and continuous process optimization. This ensures the system consistently operates at peak efficiency while meeting all regulatory standards.

Scope of Work

The scope of work for this project extended far beyond equipment supply. GWT took full responsibility for delivering a complete solution—from design and engineering through to commissioning and post-handover support. This end-to-end approach ensured the client received a seamless and reliable system that was immediately ready for operation.

Key deliverables included:

  • Detailed engineering, design, and technology selection
  • Procurement and supply of all major equipment
  • Civil, mechanical, and electrical installation
  • Testing, commissioning, and handover to the client
  • Post-commissioning O&M support and technical services

Our Approach

At GWT, we approach every project with the mindset that success depends on both technical precision and operational readiness. For Pioneer Oil & Gas, this meant rapidly mobilizing resources, ensuring seamless integration of civil, mechanical, and electrical systems, and maintaining close collaboration with the client’s team throughout execution. By combining meticulous planning with flexible problem-solving, we delivered a treatment solution that not only met strict timelines but also provided long-term resilience. Beyond handover, our commitment continues through dedicated O&M support, guaranteeing sustained reliability and performance over the system’s lifecycle.

Key Benefits

  • Reliable compliance with environmental discharge standards
  • Reduced operating costs through optimized chemical dosing and minimal sludge generation
  • High resilience to variable wastewater flows and loads
  • Sustained performance via preventive maintenance and dedicated technical support
  • Operational continuity with no delays in project execution